Case study
Weekend ghost flow in an empty building
WaterFood & Beverage Processing
Water still running through an empty factory all weekend, worth about a fifth of the monthly bill.
Water kept running through a food processing factory during its weekend shutdown. We use incoming flow readings and submetering to separate that demand from production and flag it while the facility is empty.
What the data showed
Hover or arrow-key across the trace to read any interval. The flagged point is the one that started the conversation.
| Interval | Incoming service (L/min) |
|---|---|
| 00:00 | 46 |
| 00:30 | 47 |
| 01:00 | 46 |
| 01:30 | 45 |
| 02:00 | 47 |
| 02:30 | 46 |
| 03:00 | 45 |
| 03:30 | 46 |
| 04:00 | 46 |
| 04:30 | 47 |
| 05:00 | 46 |
| 05:30 | 47 |
| 06:00 | 46 |
| 06:30 | 47 |
| 07:00 | 46 |
| 07:30 | 47 |
| 08:00 | 46 |
| 08:30 | 46 |
| 09:00 | 47 |
| 09:30 | 46 |
| 10:00 | 44 |
| 10:30 | 46 |
| 11:00 | 45 |
| 11:30 | 46 |
| 12:00 | 45 |
| 12:30 | 47 |
| 13:00 | 47 |
| 13:30 | 46 |
| 14:00 | 46 |
| 14:30 | 47 |
| 15:00 | 45 |
| 15:30 | 47 |
| 16:00 | 45 |
| 16:30 | 47 |
| 17:00 | 45 |
| 17:30 | 44 |
| 18:00 | 45 |
| 18:30 | 47 |
| 19:00 | 46 |
| 19:30 | 45 |
| 20:00 | 47 |
| 20:30 | 44 |
| 21:00 | 45 |
| 21:30 | 47 |
| 22:00 | 47 |
| 22:30 | 46 |
| 23:00 | 45 |
| 23:30 | 46 |
| Before | A flat monthly number with no explanation inside it |
|---|---|
| After | A weekend baseline that should read zero, and an alert when it does not |
Background
The factory closes on Friday evening and starts production again on Monday morning. Water continues to pass through the incoming service during the shutdown. Our starting point is the period between those shifts: what does water use look like when the factory is empty?
The problem
The monthly bill combines production demand and weekend consumption in a single total. It gives the team a cost to review, but leaves the timing unexplained. Water running after everyone has left can sit inside that total without drawing attention to the shutdown period. The team needs readings that show when the flow occurs.
How we found it
We use a flow meter on the incoming water service to follow demand through the weekend. Submeters on the largest consumers help narrow the search within the facility. Reading those traces alongside the shutdown schedule makes the remaining flow visible. Overnight and weekend alerts flag demand above the expected baseline, so the team has a specific period to investigate.
What changed
The team can now review a weekend trace and see whether water use falls to the expected zero baseline. An alert draws attention to flow that continues during shutdown. The incoming meter shows the overall demand, while the submeters help direct the next check. That gives the team a clearer starting point for investigating water use before the next monthly bill arrives.
The lesson
We make shutdown periods part of the monitoring plan. For this factory, the weekend provides a clear window for checking whether water is still running after production stops. Keeping that baseline visible gives the facility team a practical check to return to after a change, and an alert when the pattern needs attention again.
What changed
Before
A flat monthly number with no explanation inside it
After
A weekend baseline that should read zero, and an alert when it does not
~20%of the monthly water bill
Consumed with the building empty, over a weekend.
Where to go next
The sector, the sibling studies, and the calculator that runs this same arithmetic on your own numbers.
WaterManufacturing: Automotive, Plastics & Rubber
Chiller circuit leak isolated without a shutdown
An automotive factory
Continuous monitoring helped identify and isolate a leaking cooling loop while the production line remained in operation.
1 loopisolated
Cooling towersWaterManufacturing: Automotive, Plastics & RubberBuilding Materials, Concrete & Aggregates
Cooling tower blowdown optimization
A plastics manufacturing factory
Blowdown was controlled by a timer rather than conductivity, causing usable water to be discharged unnecessarily.
1 setpointchanged
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A transfer line's flow signature drifted, the alert fired, and the diaphragm was replaced on a schedule instead of during a shutdown.
Scheduledreplacement
Find out what’s hiding in your factory.
Every study on this site started with somebody walking a floor and asking what the numbers actually were. Our team will do the same on yours and tell you honestly what we find.
Book a site visitAll case studies
or call 1-833-QUANTFY (1-833-782-6839)